BEOK Thermostat Production Process – Precision Manufacturing from Start to Finish

 

From-concept-to-finished-product-reference-layout

 

Introduction:
At Beok Controls, every thermostat undergoes a meticulously designed 5-stage production process: Incoming Quality Control (IQC) → Core Component Processing → Assembly → Finished Product Testing → Packaging & Warehousing. From the moment raw materials arrive at our factory to the final packaged product ready for global shipment, quality is monitored and controlled at every single step. Below is a detailed look at our complete manufacturing workflow.

 

Stage 1: Incoming Quality Control (ICQ)

Before any component enters our production line, it must pass rigorous incoming inspection.

 

01-Material Receiving

 

01

Material Receiving

02-Electronic-Component-Inspection

 

02

Electronic Component Inspection

03-Structural-Part-Inspection

 

03

Structural Part Inspection

04-Qualified-Warehousing

 

04

Qualified Warehousing

Step Operation Details Inspection Standard
① Material Receiving Verify purchase orders, confirm material model, quantity, and batch number Match BOM exactly
② Electronic Component Inspection

Resistors/capacitors/chips: verify specifications (resistance, capacitance, voltage rating);

Sensors: test sensitivity (output signal at 25°C);

PCBs: no warping, short circuits, or pad oxidation

Component defect rate ≤0
③ Structural Part Inspection

Enclosures (ABS material): no burrs, color difference, or deformation;

Buttons: consistent rebound force;

Screws: correct specifications, no thread damage

Dimensional tolerance ±0.2mm
④ Qualified Warehousing Affix "PASS" labels to qualified materials; store separately (ESD area for electronics, moisture-proof area for structural parts) FIFO (First-In-First-Out)

 

Stage 2: Core Component Processing

This stage transforms raw PCBs and components into functional circuit board assemblies through SMT, DIP, and pre-assembly processes.

 

2.1 PCB SMT (Surface Mount Technology) Process

Step Operation Details Standard/Control Point

① PCB Pre-treatment

Clean PCB surface of oil, dust, and oxidation layer ESD dust removal equipment, alcohol wipe

② Solder Paste Printing

Position stencil, print solder paste onto PCB pads Solder paste thickness: 0.15-0.2mm; no missing or bridging
③ Component Placement Use pick-and-place machine to precisely mount chips, resistors, capacitors, sensors, etc. onto pads

Placement accuracy: ±0.05mm;

no misalignment or missing components

④ Reflow Soldering Pass PCB through reflow oven following temperature profile: Pre-heat (80-120°C) → Soak (150-170°C) → Reflow (230-250°C) → Cooling No cold joints, false soldering, or solder bridging
⑤ SMT First-Article Inspection Inspect first PCB with AOI; proceed to mass production only after approval First-article sign-off; random sampling every hour thereafter
⑥ Rework Manually rework defective boards with soldering iron; touch up or replace components ESD wrist strap required; re-inspect after rework
⑦ QC Inspection Passed boards go to ESD-safe storage PCBA must be placed on ESD racks or in ESD bins
05 PCB Pre-treatment
06-Solder-Paste-Printing
07 Component Placement Auto Machine
08-AOI-Automated-Optical-Inspection

2.2 DIP (Dual In-line Package) Soldering Process

Step Operation Details Standard/Control Point
① Through-Hole Preparation Insert connectors, power interfaces, fuses, and other odd-form components into corresponding PCB holes Correct component polarity; no reverse insertion
② Wave Soldering Pass PCB through wave soldering machine; solder wave wets component leads Soldering temperature: 260±5°C; duration: 3-5 seconds
③ Lead Trimming Trim excess leads (leave 0.5-1mm); clean residual solder and flux from PCB surface No lead scratches on PCB
④ Solder Bridging Correction Use soldering iron to separate bridged solder joints Soldering iron temperature: 380°C
⑤ Cleaning Use brush with cleaning solution to clean PCB surface No solder residue or water marks
⑥ QC Inspection 100% inspection; passed boards go to ESD-safe storage PCBA on ESD racks or in ESD bins
09 Through-Hole Preparation
10 Wave Soldering
11 Lead Trimming
12 Cleaning

 

2.3 Panel PCB Pre-Processing

Step Operation Details Standard/Control Point
① Sensor Soldering Solder temperature sensor (thermistor/NTC) to main control PCB Soldering iron temperature: 260°C
② Coin Cell Battery Soldering Solder 3V coin cell battery; ensure correct polarity No reverse polarity; soldering iron temperature: 260°C

 

Stage 3: Assembly

3.1 Panel Assembly

Step Operation Details Standard/Control Point
① Display Module Installation Solder LCD display and backlight to main control PCB No solder bridging on LCD pins; soldering iron temperature: 260°C
② Touch Conductive Sponge Installation Attach touch conductive sponge to designated button frame on the upper board Sponge must not be misaligned
③ PCB Securing Use electric screwdriver to secure main control PCB with screws into the bezel Torque: 0.8-1.0 N·m; no stripped screws or damaged heads
④ Firmware Programming Use dedicated tool to flash specified firmware into the main control chip Verify correct program per order requirements
311 Display Module Installation
312 Touch Conductive Sponge Installation
313 PCB Securing2
314 Firmware Programming

 

3.2 Power Base Laser Engraving

32 Laser Engraving

Laser Engraving

Confirm engraving content per order requirements; proceed after sample approval.
Standard: Verify correct content; clear and legible engraving.

 

3.3 Power Module Assembly

Install power supply into power base; secure with screws; attach isolation sponge.

Standard: Verify correct power type per order; torque: 0.8-1.0 N·m

 

3.4 Final Assembly

Step: Panel-Power Engagement

Operation Details: Insert power ribbon cable into panel header; snap front panel to power base; check gap uniformity.

Standard: Gap uniformity: ≤0.3mm; no looseness

 

Stage 4: Finished Product Testing

tSETING pROCESS

 

At BEOK, we place the utmost importance on product inspection and testing. Every single thermostat undergoes a comprehensive series of rigorous tests - from power-on functional testing to 24-hour aging and final quality control. Our commitment to 100% inspection, combined with advanced testing equipment and skilled quality engineers, ensures that only products meeting our strict standards leave the factory. This dedication results in an exceptionally low defect rate and guarantees reliable performance for our customers worldwide.

 
01
 

Power-On & Functional Testing

All functions are tested at 100%

 
02
 

Aging Testing

100% on High-Temperature Aging test

 
03
 

Final Quality Control (FQC)

All products are tested at 100%

4 Testing Process

4.1 Power-On & Functional Testing

Test Item Details Standard/Control Point
Initial Power-On Test Apply rated voltage (AC220V) via test fixture; check display illumination, dead pixels, touch sensitivity, buzzer clarity, and full-screen content No short circuits or tripping; responsive touch; complete display; clear buzzer
Temperature Setting Verify temperature setpoint range accuracy Within specified range
Temperature Control Test Simulate heating/cooling; verify thermostat activates/deactivates output at setpoint Accurate switching
Mode Switching Test Manual/Auto/Temporary modes for proper operation All modes functional
Network Connectivity Activate network function; verify APP connection and control Stable connection
Fault Simulation Simulate sensor open circuit; verify fault alarm function Alarm triggers correctly
Appearance Inspection Verify laser engraving meets order requirements; check for scratches Clear engraving; no surface scratches

 

thermostat-power-test
 
thermostat-display-test
 
thermostat-function-test
 

4.2 Aging Testing

Test Item Details Standard/Control Point
High-Temperature Aging Place finished thermostats in aging room at 40°C; power on for 24 hours No system crashes or reboots during aging
Low-Temperature Test Power on for 2 hours at -10°C (sampling test) Display functions normally at low temperature

 

 

42 Aging Test
422 High-Temperature Aging
423 Low-Temperature Aging

4.3 Final Quality Control (FQC) – 100% Inspection

 

Test Item Details Standard/Control Point
Appearance Inspection Visual check of enclosure, button printing - no scratches, stains, or deformation Pass/Fail
Functional Retest Repeat functional test steps; record data; generate inspection report All functions pass
Hi-Pot Test Apply AC 1500V for 3 seconds; no breakdown or leakage Hi-Pot Tester
Pass/Fail Decision Passed units get "QUALIFIED" label; failed units marked by defect type and sent to rework area Clear labeling

 

1
2
3

Stage 5: Packaging & Warehousing

 

packing list

1

 

Inner Packaging

Place finished product in ESD bag; include user manual, warranty card, and installation accessories (screws, expansion tubes)

cartons

2

 

Outer Packaging

Load into carton; affix shipping label (product model, quantity); seal with carton sealer; apply strapping

checking

3

 

Warehouse Sampling

Warehouse conducts 5% random sampling inspection; verify quantity and model

 

Quality Is Built In, Not Inspected In.

At BEOK, quality control is not a single step - it is embedded throughout the entire production process. From IQC with a target component defect rate of ≤0.1%, to SMT placement accuracy of ±0.05mm, to 100% functional testing and 24-hour aging tests, every thermostat that leaves our factory has been verified at dozens of quality checkpoints. This commitment to quality is why BEOK thermostats are trusted in over 120 countries worldwide.

 

Interested in how we build quality into every thermostat?

Our production process is the backbone of BEOK's reliability, and we are proud to share it with you. If you have any questions about our manufacturing steps, testing procedures, or would like to discuss a custom solution, we are here to help.

 

You are also welcome to schedule a factory tour to see our precision assembly lines and quality control systems in action. Reach out to our team – we look forward to partnering with you.

Our address

Head office: Room 301, Block A, No.5 Shenwang Road, Minhang District, Shanghai, China

Phone Number

(021)-33880317-808

E-mail

shine.wang@beok-controls.com

modular-1

Your Reliable HVAC Controls Manufacturing Partner

At BEOK Controls, we specialize in smart thermostats, thermal actuators, wiring centers, radiator valves, and other HVAC control products. Our experienced team is ready to support your OEM/ODM needs, bulk orders, and customized solutions. Simply share your requirements, estimated quantities, and delivery details, and we will provide a competitive quotation tailored to your business.

Benefit You Can Get By Partnering With Us

  • Certified Quality
  • ODM Innovation
  • Stable Supply Chain
  • OEM Services
  • Efficient Production
  • Professional R&D Team
  • Competitive Pricing
  • Reliable Delivery

Get in Touch with BEOK Controls